Legal Implications of Extension of Time in Power Plant Construction Projects: A Comparative Study of FIDIC and Indonesian Law
Abstract
Disputes related to EoT in electricity EPC projects frequently escalate due to normative conflicts. This conflict arises between the time-bar clause in the FIDIC international contract standards, characterized by strict liability, and the principle of equity in Indonesian civil law. This research aims to analyze the validity of the time-bar clause in light of the principle of good faith, qualify the characteristics of excusable delay in concurrent delay situations, and reconstruct effective dispute-resolution mechanisms. The research method employed is a normative juridical approach, with comparative and empirical case study methods, applied to power plant projects. The results indicate that the application of claim rights forfeiture sanctions due to administrative notification delays possesses conditionally binding force. Such provisions can be set aside if the Service User is proven to have violated the prevention principle. Furthermore, in concurrent delay situations, national law mandates the proportional application of the apportionment principle. This research also finds that the Standing Dispute Board, as provided for in PUPR Ministerial Regulation Number 11 of 2021, is a more effective preventive instrument than arbitration for maintaining project cash flow liquidity. It is concluded that legal harmonization through teleological contract interpretation and the strengthening of Dispute Board executive regulations is imperative. The implications of these findings demand that stakeholders revise the Particular Conditions of contract to accommodate equitable administrative flexibility, ensuring legal certainty and the sustainability of national strategic infrastructure.
Downloads
References
Akhtar, M. (2020). Dealing with EPC Project Management Problems and Challenges A Case Study on Petrochemical, Oil and Gas EPC Projects in Middle-East. In Proceedings of the Abu Dhabi International Petroleum Exhibition and Conference (pp. 1-13). Society of Petroleum Engineers. https://doi.org/10.2118/203431-ms
Arief, E., & Hardjomuljadi, S. (2020). Analisis Perbandingan Model Kontrak APBN dan APBD Terhadap Model Kontrak FIDIC. Konstruksia, 11(2), 89-101. https://doi.org/10.24853/jk.11.2.8-101
Bidua, A. K. (2018). Use of FIDIC 2017 as Standard Form of Contract for EPC Projects in Oil and Gas Industry. In Proceedings of the Abu Dhabi International Petroleum Exhibition and Conference (pp. 1-9). Society of Petroleum Engineers. https://doi.org/10.2118/193243-ms
Colonial Regulations, Staatsblad Number 23 of 1847 on the Burgerlijk Wetboek voor Indonesie/the Civil Code. https://jdih.mahkamahagung.go.id/legal-product/kitab-undang-undang-hukum-perdata/detail
Egbumokei, P. I., Dienagha, I. N., Digitemie, W. N., Onukwulu, E. C., & Oladipo, O. T. (2024). Cost-Effective Contract Negotiation Strategies for International Oil & Gas Projects. International Journal of Multidisciplinary Research and Growth Evaluation, 5(4), 1284-1297. https://doi.org/10.54660/.ijmrge.2024.5.4.1284-1297
FIDIC. (2022). Amendments to the FIDIC Conditions of Contract for EPC/Turnkey Projects, 2017 (Second Edition). International Federation of Consulting Engineers. https://fidic.org/books/epcturnkey-contract-2nd-ed-2017-silver-book-reprinted-2022-amendments
Government Regulation in Lieu of Law of the Republic of Indonesia Number 2 of 2022 on Job Creation (State Gazette of the Republic of Indonesia of 2022 Number 238, Supplement to the State Gazette of the Republic of Indonesia Number 6841). https://peraturan.go.id/id/perppu-no-2-tahun-2022
Government Regulation of the Republic of Indonesia Number 22 of 2020 on the Implementing Regulation of Law Number 2 of 2017 on Construction Service (State Gazette of the Republic of Indonesia of 2020 Number 107, Supplement to the State Gazette of the Republic of Indonesia Number 6494). https://peraturan.go.id/id/pp-no-22-tahun-2020
Government Regulation of the Republic of Indonesia Number 14 of 2021 on Amendment to Government Regulation Number 22 of 2020 on the Implementing Regulation of Law Number 2 of 2017 on Construction Service (State Gazette of the Republic of Indonesia of 2021 Number 24, Supplement to the State Gazette of the Republic of Indonesia Number 6626). https://peraturan.go.id/id/pp-no-14-tahun-2021
Haryono, S., Silviana, S., & Huboyo, H. S. (2023). Evaluasi Pelaksanaan dalam Kajian Biaya Lebih pada Pekerjaan PLTU dengan Jenis Kontrak EPC: Studi Kasus Pekerjaan PLTU oleh PT. X. Jurnal Profesi Insinyur Indonesia, 1(6), 216-224. https://doi.org/10.14710/jpii.2023.18833
Indahwati, A. N., Sami’an, S., & Hardjomuljadi, S. (2025). Arbitration in Resolving Construction Cost Claim Disputes Due to Time Extensions: A Study of Contract Law in Indonesia. SIGn Jurnal Hukum, 6(2), 263-281. https://doi.org/10.37276/sjh.v6i2.388
Irwansyah. (2020). Penelitian Hukum: Pilihan Metode & Praktik Penulisan Artikel. Mirra Buana Media.
Ismanto, H., & Hardjomuljadi, S. (2018). Analisis Pengaruh Dewan Sengketa & Arbitrase terhadap Penyelesaian Sengketa Konstruksi berdasarkan FIDIC Condition of Contract 2017. Jurnal Konstruksia, 10(1), 73-85. https://doi.org/10.24853/jk.10.1.73-86
Kustiah, H., Hardjomuljadi, S., & Amin, M. (2022). Faktor Pengaruh Variation Order pada Konstruksi Jalan dan Jembatan untuk Mengurangi Klaim Konstruksi. Jurnal Konstruksia, 13(2), 81-91. https://doi.org/10.24853/jk.13.2.81-92
Lastikayasa, I. W., & Kurniawan, I. G. A. (2025). Legal Philosophy in Construction Contract Dispute Resolution: Between Arbitration and Litigation. Pena Justisia: Media Komunikasi dan Kajian Hukum, 24(1), 6202-6219. https://doi.org/10.31941/pj.v24i2.7122
Law of the Republic of Indonesia Number 30 of 1999 on Arbitration and Alternative Dispute Resolution (State Gazette of the Republic of Indonesia of 1999 Number 138, Supplement to the State Gazette of the Republic of Indonesia Number 3872). https://www.dpr.go.id/dokumen/jdih/undang-undang/detail/431
Law of the Republic of Indonesia Number 2 of 2017 on Construction Service (State Gazette of the Republic of Indonesia of 2017 Number 11, Supplement to the State Gazette of the Republic of Indonesia Number 6018). https://www.dpr.go.id/dokumen/jdih/undang-undang/detail/1687
Law of the Republic of Indonesia Number 6 of 2023 on Enactment of Government Regulation in Lieu of Law Number 2 of 2022 on Job Creation Into Law (State Gazette of the Republic of Indonesia of 2023 Number 41, Supplement to the State Gazette of the Republic of Indonesia Number 6856). https://www.dpr.go.id/dokumen/jdih/undang-undang/detail/1825
Lessy, A. S., Sami’an, S., & Hardjomuljadi, S. (2025). Realizing a Fair Competition in the Construction Procurement Process at the State Electricity Company: A Normative Review. SIGn Jurnal Hukum, 6(2), 418-432. https://doi.org/10.37276/sjh.v6i2.403
Lo, A., Lee, E. P., Chen, N. E., Baretta, N., Nugraha, D. P., & Tanaya, V. (2025). Legal Implications of Government Default in the Ranggulalo Market Construction Contract: An Analysis of Decision Number 28/Pdt.G/2021/PN Dgl. SIGn Jurnal Hukum, 7(1), 70-91. https://doi.org/10.37276/sjh.v7i1.416
Merkin, R., & Saintier, S. (2023). Poole’s Textbook on Contract Law (Sixteenth Edition). Oxford University Press. https://doi.org/10.1093/he/9780192885098.001.0001
Najmifaza, S. N., Barokah, N. D., & Dafira, L. (2025). Perlindungan Hukum Terhadap Penyedia Jasa dalam Kontrak Konstruksi Pemerintah: Studi Kasus Pemutusan Sepihak. Al-Zayn: Jurnal Ilmu Sosial & Hukum, 3(2), 1051-1059. https://doi.org/10.61104/alz.v3i2.1280
Nugroho, A., & Kirana, K. C. (2024). Skema Pengupahan Karyawan Pada Perusahaan Konstruksi Berdasarkan Risiko Keselamatan Kerja. Jurnal Teknologi dan Manajemen Industri Terapan, 3(1), 67-77. https://doi.org/10.55826/tmit.v3iI.295
Putra, S. B., & Hardjomuljadi, S. (2020). Analisis Pemilihan Model Kontrak Konstruksi Pekerjaan Pembangunan Pembangkit Listrik (FIDIC Rainbow Contract 2017). Konstruksia, 11(2), 33-45. https://doi.org/10.24853/jk.11.2.33-45
Qadri, Q., Sami’an, S., & Saputro, A. (2025). Requirements for Overhead Cost Claims and Construction Dispute Resolution Mechanisms in Indonesia: A Normative Study. SIGn Jurnal Hukum, 6(2), 433-451. https://doi.org/10.37276/sjh.v6i2.404
Qamar, N., & Rezah, F. S. (2020). Metode Penelitian Hukum: Doktrinal dan Non-Doktrinal. CV. Social Politic Genius (SIGn). https://books.google.co.id/books?id=TAQHEAAAQBAJ
Regulation of Minister of Public Works and Housing of the Republic of Indonesia Number 11 of 2021 on Procedures and Technical Guidelines for Construction Dispute Boards (Bulletin Gazette of the Republic of Indonesia of 2021 Number 307). https://peraturan.go.id/id/permen-pupr-no-11-tahun-2021
Safitri, E., & Taupiqqurrahman, T. (2024). Analisis Tuntutan Ganti Rugi Akibat Wanprestasi dalam Kontrak Pengadaan Sarana Penunjang NICU dan Bedah Saraf. Jurnal Usm Law Review, 7(1), 144-162. https://doi.org/10.26623/julr.v7i1.8120
Sampara, S., & Husen, L. O. (2016). Metode Penelitian Hukum. Kretakupa Print.
Setiyawan, I. A., Pasaribu, D. M., & Hikmahtiar, R. (2025). The Legal Force of Change Order Instruction for the Work in Construction Contracts: A Case Study of Substation Development in Central Sumatra. SIGn Jurnal Hukum, 6(2), 452-467. https://doi.org/10.37276/sjh.v6i2.409
Silva, P. M., Domingo, N., & Ali, N. A. N. A. (2025). An Interactive Pre-Contract Dispute Avoidance Toolkit for New Zealand Construction Industry. Construction Innovation, 25(7), 268-291. https://doi.org/10.1108/ci-10-2024-0309
Singh, R. K., Shrestha, S. B., Bantawa, P., & Thakur, S. (2025). The Architecture of Adjudication: An Analysis of Dispute Resolution and Arbitration within Nepal’s Contractual and Procurement Framework. International Journal of Advanced Research in Engineering and Technology, 16(5), 1-12. https://doi.org/10.34218/ijaret_16_05_001
Sukadana, D. A. P. (2025). Implikasi Yuridis Wanprestasi dalam Hukum Perdata antara Teori dan Praktik. Jurnal Rechtens, 14(1), 139-154. https://doi.org/10.56013/rechtens.v14i1.4292
Sumantri, M. F. A., Sami’an, S., & Hardjomuljadi, S. (2025). Concurrent Delay and Price Adjustment in Multi-Year Contracts: An Indonesian Construction Law Perspective. SIGn Jurnal Hukum, 6(2), 343-367. https://doi.org/10.37276/sjh.v6i2.399
Suyoga, I. M. W., & Usfunan, Y. (2020). Penyelesaian Sengketa Kontrak Kerja Konstruksi Melalui Ajudikasi dan Perbandingan dengan Arbitrase. Acta Comitas: Jurnal Hukum Kenotariatan, 5(2), 240-251. https://doi.org/10.24843/ac.2020.v05.i02.p03
Ustien, D. O., & Marhum, U. (2022). Perspektif Hukum Terhadap Suatu Perjanjian. Jurnal Lakidende Law Review, 1(2), 85-92. https://doi.org/10.47353/delarev.v1i2.11
Winata, E. G., & Hardjomuljadi, S. (2021). Analisis Klausula Kontrak yang Terkait dengan Klaim pada FIDIC Condition of Contract 1999. Jurnal Muara Sains, Teknologi, Kedokteran, dan Ilmu Kesehatan, 5(2), 501-512. https://doi.org/10.24912/jmstkik.v5i2.12195
Wiraantaka, J. A., Sami’an, S., & Hardjomuljadi, S. (2025). Implementation of Legal Principles in Construction Service Agreements: A Normative Study. SIGn Jurnal Hukum, 6(2), 386-400. https://doi.org/10.37276/sjh.v6i2.401
Wisatrioda, B., Sebastian, R. R., Sami’an, S., & Hardjomuljadi, S. (2025). Resolving Hydropower Plant Construction Disputes through a Standing Dispute Board: A Case Study of Asahan 3 HEPP. SIGn Jurnal Hukum, 6(2), 296-312. https://doi.org/10.37276/sjh.v6i2.392
Woodhead, B., Davis, T., & Walker, R. (2023). Collaborative Construction Contracts. Alberta Law Review, 61(2), 307-351. https://doi.org/10.29173/alr2767
Copyright (c) 2025 Amaliyah Noor Indahwati, Eric Baroroh, Haryo Wisnuaji, Mahfiar Fajar Akbar Sumantri, Sarwono Hardjomuljadi, S. Sami’an

This work is licensed under a Creative Commons Attribution 4.0 International License.
.jpg)












