Arbitration in Resolving Construction Cost Claim Disputes Due to Time Extensions: A Study of Contract Law in Indonesia
Abstract
This research aims to analyze the resolution of construction cost claim disputes arising from time extensions, focusing on the arbitration mechanism. The findings indicate that delays in the completion of construction projects not only give rise to cost claim disputes but also necessitate a meticulous analysis of the causes of the delays and the responsibilities of the parties involved. In this regard, arbitration offers a more effective and efficient dispute resolution mechanism than litigation. The advantages of arbitration, including the speed of the process, confidentiality, expertise of arbitrators, procedural flexibility, and binding awards, make it a favourable option for the parties. Therefore, the parties must pay close attention to the arbitration clause in the construction contract. This clause must be formulated clearly and definitively, encompassing the types of construction cost claim disputes arising from time extensions, including claims for price adjustment, overhead costs, extension of performance bonds, material demurrage, and equipment idleness. In addition, the parties can also utilize the Binding Opinions of the BANI Arbitration Center as an instrument for dispute prevention and resolution. For information, Binding Opinions have binding legal force on the parties and are enforceable through the District Court. Thus, the Binding Opinions of the BANI Arbitration Center are beneficial as a dispute resolution instrument and contribute to the development of legal scholarship.
Downloads
References
Abadi, I., Utomo, J., & Sukamta, S. (2023). Evaluasi Klaim Konstruksi dalam Persepektif Kontraktor Utama dan Subkontraktor. Wahana Teknik Sipil: Jurnal Pengembangan Teknik Sipil, 28(2), 157-173. Retrieved from https://jurnal.polines.ac.id/index.php/wahana/article/view/5233
Abougamil, R. A., Thorpe, D., & Heravi, A. (2024). A BIM Package with a NEC4 Contract Option to Mitigate Construction Disputes in the Kingdom of Saudi Arabia. Buildings, 14(7), 1-28. https://doi.org/10.3390/buildings14072009
Abwunza, A. A., Peter, T. K., & Muigua, K. (2021). Explaining the Effectiveness of Construction Arbitration: An Organizational Justice Perspective. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 13(3), 1-47. https://doi.org/10.1061/(asce)la.1943-4170.0000541
Alghamdi, M. M., Shash, A., Alshaibani, A., & Mazher, K. M. (2024). Assessment of Dispute Causes in Government Building Maintenance Projects through Adjusted Importance Rating and Risk Mapping. Results in Engineering, 24, 1-10. https://doi.org/10.1016/j.rineng.2024.103551
AlRaeesi, E. J. H., & Ojiako, U. (2021). Examination of Legal Perspective of Public Policy Implementation on Construction Projects Arbitration. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 13(3), 1-44. https://doi.org/10.1061/(asce)la.1943-4170.0000474
Aminuddin, F., Ch’ng, W. T., & Ismail, A. S. (2024). Condition Precedents to the Extension of Time (EOT) Claims in Building and Infrastructure Projects: A Review of the Malaysian Litigation Cases. International Journal of Real Estate Studies, 18(2), 103-119. https://doi.org/10.11113/intrest.v18n2.384
Besaiso, H., & Fenn, P. (2022). How International Construction Arbitrators Make Their Decisions: Status of Commercial Norms and International Construction Law. Journal of Construction Engineering and Management, 148(9), 1-11. https://doi.org/10.1061/(asce)co.1943-7862.0002321
Chammout, B., El-Adaway, I. H., Nabi, M. A., & Assaad, R. H. (2024). Price Escalation in Construction Projects: Examining National and International Contracts. Journal of Construction Engineering and Management, 150(9), 1-19. https://doi.org/10.1061/jcemd4.coeng-13918
Colonial Regulations, Staatsblad Number 23 of 1847 on the Burgerlijk Wetboek voor Indonesie/the Civil Code. https://jdih.mahkamahagung.go.id/legal-product/kitab-undang-undang-hukum-perdata/detail
Crisyanti, D., Nurlaily, N., & Seroja, T. D. (2023). Dynamics of Conflict and Dispute Resolution in Culinary Business Partnership Agreements. SIGn Jurnal Hukum, 5(1), 44-58. https://doi.org/10.37276/sjh.v5i1.260
Ewangga, S. O. (2022). Comparison of Public Policy Defenses Implementation in Indonesia with USA and UK. Transnational Business Law Journal, 3(2), 77-94. https://doi.org/10.23920/transbuslj.v3i2.1371
Firdausy, S., & Mahanani, A. E. E. (2021). Legal Protection Effort towards Mark Owner from the Share-in Jar Cosmetic Trade. SIGn Jurnal Hukum, 3(1), 26-39. https://doi.org/10.37276/sjh.v3i1.113
Fitrianggraeni, S., Fauziah, E. F., & Purnama, S. (2023). Dealing with Unsatisfactory Arbitral Awards: Observing the Grounds of Annulment of Arbitral Awards in Indonesia. Journal of International Arbitration, 40(6), 735-764. https://doi.org/10.54648/joia2023030
Fredella, F. B., & Widiyastuti, Y. S. M. (2022). Kontrak Kerja Konstruksi Pembangunan Gedung GMB Ditinjau Berdasarkan Red Book FIDIC. Jurnal Yustika: Media Hukum dan Keadilan, 25(2), 65-79. https://doi.org/10.24123/yustika.v25i02.5229
Ghahari, S. A., Queiroz, C., Labi, S., & McNeil, S. (2024). Corruption Propensity and Mitigation at Different Phases of Infrastructure Development. Public Works Management & Policy, 29(1), 5-44. https://doi.org/10.1177/1087724X231162544
Government Regulation in Lieu of Law of the Republic of Indonesia Number 2 of 2022 on Job Creation (State Gazette of the Republic of Indonesia of 2022 Number 238, Supplement to the State Gazette of the Republic of Indonesia Number 6841). https://peraturan.go.id/id/perppu-no-2-tahun-2022
Handoko, B., Prihadiati, R. R. L. A., & Mulyana, M. (2023). Kepastian Hukum Badan Arbitrase dan Alternatif Penyelesaian Sengketa Konstruksi Indonesia dalam Perjanjian Penanaman Modal Asing di Sektor Konstruksi. Humaniorum, 1(2), 63-72. https://doi.org/10.37010/hmr.v1i02.16
Hardjomuljadi, S. (2023). Kamus Kontrak Konstruksi: FIDIC Conditions of Contract. Balai Pustaka.
Ingarasi, P., & Suwigno, N. P. (2022). The Benefits of Registered Trademark for MSME Actors in Surakarta City: A Case Study of IPR Protection. SIGn Jurnal Hukum, 4(2), 233-246. https://doi.org/10.37276/sjh.v4i2.187
Irsan, I., Utama, M., Nurliyantika, R., Saputra, R., & Idris, A. (2024). Drafting Extension of Time for Completion to Avoid Time at Large in Construction Contract. Notaire, 7(2), 247-266. https://doi.org/10.20473/ntr.v7i2.58379
Law of the Republic of Indonesia Number 30 of 1999 on Arbitration and Alternative Dispute Resolution (State Gazette of the Republic of Indonesia of 1999 Number 138, Supplement to the State Gazette of the Republic of Indonesia Number 3872). https://jdih.dpr.go.id/setjen/detail-dokumen/tipe/uu/id/431
Law of the Republic of Indonesia Number 48 of 2009 on the Judicial Power (State Gazette of the Republic of Indonesia of 2009 Number 157, Supplement to the State Gazette of the Republic of Indonesia Number 5076). https://jdih.dpr.go.id/setjen/detail-dokumen/tipe/uu/id/585
Law of the Republic of Indonesia Number 2 of 2017 on Construction Service (State Gazette of the Republic of Indonesia of 2017 Number 11, Supplement to the State Gazette of the Republic of Indonesia Number 6018). https://jdih.dpr.go.id/setjen/detail-dokumen/tipe/uu/id/1687
Law of the Republic of Indonesia Number 6 of 2023 on Enactment of Government Regulation in Lieu of Law Number 2 of 2022 on Job Creation Into Law (State Gazette of the Republic of Indonesia of 2023 Number 41, Supplement to the State Gazette of the Republic of Indonesia Number 6856). https://jdih.dpr.go.id/setjen/detail-dokumen/tipe/uu/id/1825
Mahafzah, Q. A., & Alflaieh, M. T. (2023). Proper Legal Drafting of Arbitration Clauses. Journal of Law and Sustainable Development, 11(12), 1-23. https://doi.org/10.55908/sdgs.v11i12.1948
Marito, A., & Kanthika, I. M. (2024). Mitigasi Risiko Sengketa dalam Kontrak Jasa Konstruksi di Pemerintahan Kota Tangerang Selatan. Arus Jurnal Sosial dan Humaniora, 4(3), 2488-2501. https://doi.org/10.57250/ajsh.v4i3.971
Mishra, S. K., & Kushwaha, H. (2023). Managing Litigation Risk through Business Legal Expense Insurance: Facilitators and Inhibitors for MSMEs. IIMB Management Review, 35(1), 57-70. https://doi.org/10.1016/j.iimb.2023.04.002
Mokoagow, J. A., Rifai, A., & Shebubakar, A. (2024). Aspek Kontraktual Pelaksanaan Perjanjian Konsorsium Kontraktor Pada Struktur Split Contract. Unes Journal of Swara Justisia, 8(1), 95-112. https://doi.org/10.31933/ujsj.v8i1.481
Mwamvani, H. D. J., Amoah, C., & Ayesu-Koranteng, E. (2022). Causes of Road Projects’ Delays: A Case of Blantyre, Malawi. Built Environment Project and Asset Management, 12(2), 293-308. https://doi.org/10.1108/BEPAM-09-2021-0113
Qamar, N., & Rezah, F. S. (2020). Metode Penelitian Hukum: Doktrinal dan Non-Doktrinal. CV. Social Politic Genius (SIGn).
Safnul, D., Kamello, T., Purba, H., & Ikhsan, E. (2024). Settlement of Contract Business Activities Disputes through Arbitration: Evidence from Construction Service Company. Calitatea, 25(201), 286-291. https://doi.org/10.47750/qas/25.201.31
Salem, M., Kirkham, R., Al-Sabah, R., & Chebli, S. (2024). COVID-19 and the Construction Sector: Impacts and an Agenda for Post-Pandemic Policy in the Context of Kuwait. Journal of Engineering Research, 12(4), 719-731. https://doi.org/10.1016/j.jer.2023.11.017
Sami’an, S., Rosyadi, I., Suliyanto, E., Soeharto, A., & Aulia, A. (2024). Sengketa Hukum dalam Kontrak Konstruksi: Studi Banding Sistem Hukum Perdata. Bureaucracy Journal: Indonesian Journal of Law and Social-Political Governance, 4(2), 1343-1352. Retrieved from https://bureaucracy.gapenas-publisher.org/index.php/home/article/view/407
Sampara, S., & Husen, L. O. (2016). Metode Penelitian Hukum. Kretakupa Print.
Simbolon, P. G. M. (2023). Implementation of the Fair Use Defense Doctrine and Minimum Standards Principle in Copyright Dispute Settlement. SIGn Jurnal Hukum, 5(1), 74-90. https://doi.org/10.37276/sjh.v5i1.263
Supriyadi, S., Gufron, A. Z. M., & Indrayanti, K. W. (2022). Juridical Review of Construction Work Contract Disputes in Indonesia. Jurnal Cakrawala Hukum, 13(3), 325-336. https://doi.org/10.26905/idjch.v13i3.8916
Syahputri, N. G. (2022). Identifikasi Faktor Penyebab Klaim yang Berpotensi Menjadi Dispute pada Proyek Konstruksi Bangunan Gedung Rumah Sakit. Jurnal Pendidikan Tambusai, 6(3), 13694-13702. https://doi.org/10.31004/jptam.v6i3.4493
Viet, L. T., & Thanh, H. P. (2024). Determinants of Commercial Arbitration Selection to Resolve Disputes: Insights from Vietnamese Managers. Journal of International Arbitration, 41(3), 371-396. https://doi.org/10.54648/joia2024017
Widodo, S., Suraji, A., & Musyafa, A. (2023). Deviasi Penerapan Aspek Hukum Kontrak Konstruksi. Jurnal Penelitian Rumpun Ilmu Teknik, 2(2), 53-67. https://doi.org/10.55606/juprit.v2i2.1615
Winata, E. G., & Hardjomuljadi, S. (2021). Analisis Klausula Kontrak yang Terkait dengan Klaim pada FIDIC Condition of Contract 1999. Jurnal Muara Sains, Teknologi, Kedokteran, dan Ilmu Kesehatan, 5(2), 501-512. https://doi.org/10.24912/jmstkik.v5i2.12195
Yanuar, R., Saputro, A., & Sami’an, S. (2025). Sustainability of Infrastructure Development in Indonesia: A Legal Analysis of Price Adjustments in Construction Contracts. SIGn Jurnal Hukum, 6(2), 247-262. https://doi.org/10.37276/sjh.v6i2.385
Zubir, A., Wasitaatmadja, F. F., & Sadino, S. (2024). The Imposition of Financial Consequences Due to Force Majeure in Construction Service Agreements. Audito Comparative Law Journal (ACLJ), 5(2), 92-104. https://doi.org/10.22219/aclj.v5i2.33064
Copyright (c) 2025 Amaliyah Noor Indahwati, S. Sami’an, Sarwono Hardjomuljadi