Resolving Construction Disputes through Negotiation: A Case Study of Amendments to the Environmental Impact Assessment for an Electricity Infrastructure Project

  • Reza Rafly Sebastian Universitas Pekalongan, Indonesia
  • Bayu Wisatrioda Universitas Pekalongan, Indonesia
  • S. Sami’an Universitas Pekalongan, Indonesia
  • Sarwono Hardjomuljadi Universitas Pekalongan, Indonesia

Abstract

Electricity infrastructure development in Indonesia often faces disputes that can potentially hinder project completion. One of the prominent issues in construction disputes is the amendment to the EIA, which is legally regulated by Law Number 32 of 2009 and Government Regulation Number 22 of 2021. This study employs a qualitative approach with a case study on Project X, an electricity transmission line construction project. Data were collected through literature review, document analysis, and participatory observation of the negotiation process. The results show that the Contractor’s financial constraints were the root of the dispute in Project X, which had implications for the delayed completion of the amendment to the EIA. Negotiation, as an ADR mechanism, played a crucial role in resolving this dispute. The success of the negotiation was supported by interactional dynamics characterized by effective communication, adaptive leadership, and comprehensive data support. This case study affirms the repositioning of negotiation as an effective dispute resolution mechanism in the construction context, especially involving environmental aspects. This research also emphasizes the importance of compliance with EIA regulations, especially Law Number 32 of 2009 and Government Regulation Number 22 of 2021, and highlights the need for effective communication strategies in the negotiation process to reach a sustainable agreement.

Keywords: ADR, Construction Disputes, EIA, Electricity Infrastructure, Negotiation

Article Metrics

Downloads

Download data is not yet available.

References

Agnes, M., & Koestoer, R. H. (2021). A Review on Sustainable Construction Regulations in Asian Countries: Savvy Insights for Indonesia. Jurnal Ilmu Lingkungan, 19(2), 459-464. https://doi.org/10.14710/jil.19.2.459-464

Asis, L. F. (2024). Alternative Dispute Resolution (ADR) Berbasis Al-Qur’an. Taruna Law: Journal of Law and Syariah, 2(1), 107-118. https://doi.org/10.54298/tarunalaw.v2i01.182

Crisyanti, D., Nurlaily, N., & Seroja, T. D. (2023). Dynamics of Conflict and Dispute Resolution in Culinary Business Partnership Agreements. SIGn Jurnal Hukum, 5(1), 44-58. https://doi.org/10.37276/sjh.v5i1.260

Decision of Minister of Energy and Mineral Resources of the Republic of Indonesia Number 188.K/HK.02/MEM.L/2021 on the Ratification of the Electricity Supply Business Plan of the State Electricity Company (Persero) for 2021 to 2030. https://jdih.esdm.go.id/dokumen/view?id=2192

Gayo, S. (2024). The Use of Mediation in Industrial Dispute Resolution. Legalpreneur Journal, 2(2), 213-225. https://doi.org/10.46576/lpj.v2i2.4326

Government Regulation in Lieu of Law of the Republic of Indonesia Number 2 of 2022 on Job Creation (State Gazette of the Republic of Indonesia of 2022 Number 238, Supplement to the State Gazette of the Republic of Indonesia Number 6841). https://peraturan.go.id/id/perppu-no-2-tahun-2022

Government Regulation of the Republic of Indonesia Number 22 of 2021 on the Implementation of Environmental Protection and Management (State Gazette of the Republic of Indonesia of 2021 Number 32, Supplement to the State Gazette of the Republic of Indonesia Number 6634). https://peraturan.go.id/id/pp-no-22-tahun-2021

Hardjomuljadi, S. (2023). Kamus Kontrak Konstruksi: FIDIC Conditions of Contract. Balai Pustaka.

He, T., Liu, L., & Gu, M. (2023). The Role and Development Trend of Third-Party Mediation in Environmental Disputes. Sustainability, 15(13), 1-15. https://doi.org/10.3390/su151310197

Henderson, A. (2021). The Conversations of Leaders. Journal of Nursing Management, 29(7), 1891-1892. https://doi.org/10.1111/jonm.13328

Hendrayana, Y. (2020). Peran Keterampilan Negosiasi Terhadap Manajemen Konflik Melalui Intermediasi Efektivitas Komunikasi. Parameter, 5(1), 113-126. https://doi.org/10.37751/parameter.v5i1.144

Indahwati, A. N., Sami’an, S., & Hardjomuljadi, S. (2025). Arbitration in Resolving Construction Cost Claim Disputes Due to Time Extensions: A Study of Contract Law in Indonesia. SIGn Jurnal Hukum, 6(2), 263-281. https://doi.org/10.37276/sjh.v6i2.388

Irwansyah. (2021). Penelitian Hukum: Pilihan Metode & Praktik Penulisan Artikel (Revision Edition). Mirra Buana Media.

Law of the Republic of Indonesia Number 30 of 1999 on Arbitration and Alternative Dispute Resolution (State Gazette of the Republic of Indonesia of 1999 Number 138, Supplement to the State Gazette of the Republic of Indonesia Number 3872). https://jdih.dpr.go.id/setjen/detail-dokumen/tipe/uu/id/431

Law of the Republic of Indonesia Number 32 of 2009 on Environmental Protection and Management (State Gazette of the Republic of Indonesia of 2009 Number 140, Supplement to the State Gazette of the Republic of Indonesia Number 5059). https://jdih.dpr.go.id/setjen/detail-dokumen/tipe/uu/id/561

Law of the Republic of Indonesia Number 2 of 2017 on Construction Service (State Gazette of the Republic of Indonesia of 2017 Number 11, Supplement to the State Gazette of the Republic of Indonesia Number 6018). https://jdih.dpr.go.id/setjen/detail-dokumen/tipe/uu/id/1687

Law of the Republic of Indonesia Number 6 of 2023 on Enactment of Government Regulation in Lieu of Law Number 2 of 2022 on Job Creation Into Law (State Gazette of the Republic of Indonesia of 2023 Number 41, Supplement to the State Gazette of the Republic of Indonesia Number 6856). https://jdih.dpr.go.id/setjen/detail-dokumen/tipe/uu/id/1825

Masoetsa, T. G., Ogunbayo, B. F., Aigbavboa, C. O., & Awuzie, B. O. (2022). Assessing Construction Constraint Factors on Project Performance in the Construction Industry. Buildings, 12(8), 1-15. https://doi.org/10.3390/buildings12081183

Nurhayati, E. S., Swarnawati, A., Wibowo, C., Widarti, E. I., Thufail, A., & Sativa, I. O. (2022). Komunikasi Efektif Pimpinan dalam Mengatasi Konflik Organisasi. MetaCommunication: Journal of Communication Studies, 7(1), 84-95. https://doi.org/10.20527/mc.v7i1.11558

Omaleng, E., & Wahid, E. (2022). Land Procurement for Public Utility Development in Mimika District, Papua Based on Law Number 2 of 2012 Regarding Land Procurement for Public Interest in the Autonomy Era. Journal of Social Science, 3(2), 324-340. https://doi.org/10.46799/jss.v3i2.322

Qamar, N., & Rezah, F. S. (2020). Metode Penelitian Hukum: Doktrinal dan Non-Doktrinal. CV. Social Politic Genius (SIGn).

Ronquillo, Y., Ellis, V. L., & Toney-Butler, T. J. (2023). Conflict Management. StatPearls Publishing. https://www.ncbi.nlm.nih.gov/books/NBK470432

Sajiah, F. S. (2020). Causes of Multi Years Contract Project Delay. Jurnal Anggaran dan Keuangan Negara Indonesia (AKURASI), 2(2), 145-162. https://doi.org/10.33827/akurasi2020.vol2.iss2.art80

Sampara, S., & Husen, L. O. (2016). Metode Penelitian Hukum. Kretakupa Print.

Supriyadi, S., Gufron, A. Z. M., & Indrayanti, K. W. (2022). Juridical Review of Construction Work Contract Disputes in Indonesia. Jurnal Cakrawala Hukum, 13(3), 325-336. https://doi.org/10.26905/idjch.v13i3.8916

Trianto, G. A. (2024, August 1). PLN Sukses Kerek Penjualan Listrik Semester I 2024, Tumbuh 7,54 Persen! State Electricity Company. Retrieved November 18, 2024, from https://web.pln.co.id/media/siaran-pers/2024/08/pln-sukses-kerek-penjualan-listrik-semester-2024-tumbuh-754-persen

Waisapi, J. Y. (2024). Analisis Penyelesaian Sengketa Konstruksi Perspektif Undang-Undang Nomor 2 Tahun 2017. In Prosiding Mewujudkan Sistem Hukum Nasional Berbasis Pancasila (Vol. 1, pp. 94-102). Fakultas Hukum Universitas 17 Agustus 1945 Surabaya. https://conference.untag-sby.ac.id/index.php/shnbc/article/view/3625

Yang, H. H., Alajmi, W. D., & Mustafa, C. W. (2023). Adequate Budgetary Allocation and Infrastructural Projects Implementation in Shenzhen City Projects, China. Journal of Entrepreneurship & Project Management, 7(5), 12-20. https://doi.org/10.53819/81018102t5194

Yanuar, R., Saputro, A., & Sami’an, S. (2025). Sustainability of Infrastructure Development in Indonesia: A Legal Analysis of Price Adjustments in Construction Contracts. SIGn Jurnal Hukum, 6(2), 247-262. https://doi.org/10.37276/sjh.v6i2.385

Published
2025-01-16
How to Cite
Sebastian, R. R., Wisatrioda, B., Sami’an, S., & Hardjomuljadi, S. (2025). Resolving Construction Disputes through Negotiation: A Case Study of Amendments to the Environmental Impact Assessment for an Electricity Infrastructure Project. SIGn Jurnal Hukum, 6(2), 282-295. https://doi.org/10.37276/sjh.v6i2.389