Harmonization of Electricity Construction Claim Prevention Mechanisms: Integration of Pre-Construction Documents, FIDIC Standards, and Standing Dispute Boards

  • Junaedi Junaedi Universitas Pekalongan, Indonesia
  • Reza Rafly Sebastian Universitas Pekalongan, Indonesia
  • Eko Rahmiko Universitas Pekalongan, Indonesia
  • Riko Yanuar Universitas Pekalongan, Indonesia
  • Sarwono Hardjomuljadi Universitas Pekalongan, Indonesia
  • S. Sami’an Universitas Pekalongan, Indonesia

Abstract

Construction disputes in national strategic electricity projects often hinder cost and time efficiency. This problem is fundamentally rooted in pre-construction document uncertainty and the regulatory gap between national contracts and international standards. This research aims to analyze the juridical implications of incomplete Employer’s Requirements documents on claim validity. It also evaluates gaps in notification mechanisms and differences in work between SOE contract standards and the FIDIC Silver Book, and constructs a dispute-prevention harmonization model. The research method used is normative legal research, with statutory, comparative, and case approaches, applied to the Asahan 3 HEPP project. The results show that disputes in the execution phase are residues of errors in concept design in the pre-construction phase. This condition creates information asymmetry and injures the principle of good faith. Comparative analysis reveals significant gaps in variation and substantiation procedures. Bureaucratic rigidity in national contracts due to the disharmony between Law Number 2 of 2017 and the state finance regime hinders rapid resolution compared to the FIDIC early warning system. However, empirical evidence shows that SDB activation can effectively mitigate conflict escalation. The research concludes that the ideal harmonization model must transform the paradigm from dispute resolution to dispute prevention. This is achieved by integrating SDB institutionalization with the validity of BIM digital data as indisputable primary evidence. This step is necessary to guarantee legal certainty and the sustainability of national strategic projects.

Keywords: Claim Prevention, Electricity Projects, FIDIC Silver Book, Pre-Construction Documents, Standing Dispute Board

Article Metrics

Downloads

Download data is not yet available.

References

Abdelalim, A. M., Al-Sabah, R., Salem, M., Said, S. O., Tantawy, M., & Al-Regal, M. R. E. (2024). Variations and Claims in International Construction Projects in the MENA Region from the Last Decade. Buildings, 14(8), 1-35. https://doi.org/10.3390/buildings14082496

Cho, H., Jung, W., & Park, C. Y. (2025). Knowledge-Driven Claim Governance: A Checklist of Entitlements and Procedures in FIDIC and National Standard Contracts. Buildings, 15(21), 1-27. https://doi.org/10.3390/buildings15213955

Colonial Regulations, Staatsblad Number 23 of 1847 on the Burgerlijk Wetboek voor Indonesie/the Civil Code. https://jdih.mahkamahagung.go.id/legal-product/kitab-undang-undang-hukum-perdata/detail

Cruz, G. S. D., & Polinar, M. A. N. (2023). Contract Management System among Selected Construction Companies in Qatar. International Journal of Multidisciplinary: Applied Business and Education Research, 4(8), 2853-2862. https://doi.org/10.11594/ijmaber.04.08.23

FIDIC. (2022). Amendments to the FIDIC Conditions of Contract for EPC/Turnkey Projects, 2017 (Second Edition). International Federation of Consulting Engineers. https://fidic.org/books/epcturnkey-contract-2nd-ed-2017-silver-book-reprinted-2022-amendments

Government Regulation in Lieu of Law of the Republic of Indonesia Number 2 of 2022 on Job Creation (State Gazette of the Republic of Indonesia of 2022 Number 238, Supplement to the State Gazette of the Republic of Indonesia Number 6841). https://peraturan.go.id/id/perppu-no-2-tahun-2022

Ilma, D. A. U., Ma’arif, F., Utoyo, B., Baldah, N., & Inayah, D. T. (2021). A Comparative Study of National and International Contracts Document Refers to the FIDIC Standard on Construction Projects in Indonesia. In P. A. Sari et al. (Eds.), Proceedings of the 1st International Conference on Economics Engineering and Social Science, InCEESS 2020 (pp. 1-7). European Alliance for Innovation. https://doi.org/10.4108/eai.17-7-2020.2303003

Irwansyah. (2020). Penelitian Hukum: Pilihan Metode & Praktik Penulisan Artikel. Mirra Buana Media.

Kalogeraki, M., & Antoniou, F. (2024). Claim Management and Dispute Resolution in the Construction Industry: Current Research Trends Using Novel Technologies. Buildings, 14(4), 1-27. https://doi.org/10.3390/buildings14040967

Koc, K., & Gurgun, A. P. (2022). Causal Relationships of Readability Risks in Construction Contracts. Teknik Dergi, 33(2), 11823-11846. https://doi.org/10.18400/tekderg.962928

Law of the Republic of Indonesia Number 30 of 2009 on Electricity (State Gazette of the Republic of Indonesia of 2009 Number 133, Supplement to the State Gazette of the Republic of Indonesia Number 5052). https://www.dpr.go.id/dokumen/jdih/undang-undang/detail/559

Law of the Republic of Indonesia Number 2 of 2017 on Construction Service (State Gazette of the Republic of Indonesia of 2017 Number 11, Supplement to the State Gazette of the Republic of Indonesia Number 6018). https://www.dpr.go.id/dokumen/jdih/undang-undang/detail/1687

Law of the Republic of Indonesia Number 6 of 2023 on Enactment of Government Regulation in Lieu of Law Number 2 of 2022 on Job Creation Into Law (State Gazette of the Republic of Indonesia of 2023 Number 41, Supplement to the State Gazette of the Republic of Indonesia Number 6856). https://www.dpr.go.id/dokumen/jdih/undang-undang/detail/1825

Lee, J., Ham, Y., & Yi, J. S. (2021). Construction Disputes and Associated Contractual Knowledge Discovery Using Unstructured Text-Heavy Data: Legal Cases in the United Kingdom. Sustainability, 13(16), 1-17. https://doi.org/10.3390/su13169403

Nugroho, R., & Hardjomuljadi, S. (2022). Pengaruh Kinerja Waktu dan Biaya Terhadap Munculnya Potensi Klaim di Proyek-Proyek Pembangkit Listrik Nasional pada Masa Pendemi COVID-19. Rekayasa: Jurnal Ilmiah Fakultas Teknik Universitas Lampung, 26(2), 49-52. https://doi.org/10.23960/rekrjits.v26i2.97

Nwaki, W., & Eze, E. (2022). Rejuvenating the Market for Earth-Based Building Construction Materials in a Developing Economy. Civil and Sustainable Urban Engineering, 2(2), 110-127. https://doi.org/10.53623/csue.v2i2.140

Okereke, R. A., Zakariyau, M., & Afonne, U. (2023). Assessment of Critical Claims and Their Impacts on the Construction Industry of Nigeria. Journal of Engineering and Technology for Industrial Applications, 9(41), 4-14. https://doi.org/10.5935/jetia.v9i41.858

Pasinggi, A., & Simanjuntak, M. R. A. (2024). Identify the Cause of Claims on Construction Contracts in the West Papua Provincial Government Area. Jurnal Indonesia Sosial Teknologi, 5(4), 1856-1865. https://doi.org/10.59141/jist.v5i4.1000

Qadri, Q., Sami’an, S., & Saputro, A. (2025). Requirements for Overhead Cost Claims and Construction Dispute Resolution Mechanisms in Indonesia: A Normative Study. SIGn Jurnal Hukum, 6(2), 433-451. https://doi.org/10.37276/sjh.v6i2.404

Qamar, N., & Rezah, F. S. (2020). Metode Penelitian Hukum: Doktrinal dan Non-Doktrinal. CV. Social Politic Genius (SIGn). https://books.google.co.id/books?id=TAQHEAAAQBAJ

Rahnamayiezekavat, P., Sorooshnia, E., Rashidi, M., Faraji, A., Mostafa, S., & Moon, S. (2022). Forensic Analysis of the Disputes Typology of the NSW Construction Industry Using PLS-SEM and Prospective Trend Analysis. Buildings, 12(10), 1-24. https://doi.org/10.3390/buildings12101571

Sampara, S., & Husen, L. O. (2016). Metode Penelitian Hukum. Kretakupa Print.

Tanriverdi, C., Atasoy, G., Dikmen, I., & Birgonul, M. T. (2021). Causal Mapping to Explore Emergence of Construction Disputes. Journal of Civil Engineering and Management, 27(5), 288-302. https://doi.org/10.3846/jcem.2021.14900

Winata, E. G., & Hardjomuljadi, S. (2021). Analisis Klausula Kontrak yang Terkait dengan Klaim pada FIDIC Condition of Contract 1999. Jurnal Muara Sains, Teknologi, Kedokteran, dan Ilmu Kesehatan, 5(2), 501-512. https://doi.org/10.24912/jmstkik.v5i2.12195

Wiraantaka, J. A., Sami’an, S., & Hardjomuljadi, S. (2025). Implementation of Legal Principles in Construction Service Agreements: A Normative Study. SIGn Jurnal Hukum, 6(2), 386-400. https://doi.org/10.37276/sjh.v6i2.401

Wisatrioda, B., Sebastian, R. R., Sami’an, S., & Hardjomuljadi, S. (2025). Resolving Hydropower Plant Construction Disputes through a Standing Dispute Board: A Case Study of Asahan 3 HEPP. SIGn Jurnal Hukum, 6(2), 296-312. https://doi.org/10.37276/sjh.v6i2.392

Yanuar, R., Saputro, A., & Sami’an, S. (2025). Sustainability of Infrastructure Development in Indonesia: A Legal Analysis of Price Adjustments in Construction Contracts. SIGn Jurnal Hukum, 6(2), 247-262. https://doi.org/10.37276/sjh.v6i2.385

Published
2025-12-29
How to Cite
Junaedi, J., Sebastian, R. R., Rahmiko, E., Yanuar, R., Hardjomuljadi, S., & Sami’an, S. (2025). Harmonization of Electricity Construction Claim Prevention Mechanisms: Integration of Pre-Construction Documents, FIDIC Standards, and Standing Dispute Boards. SIGn Journal of Social Science, 6(2), 203-219. https://doi.org/10.37276/sjss.v6i2.562

Most read articles by the same author(s)