[1]
A. N. Indahwati, E. Baroroh, H. Wisnuaji, M. F. A. Sumantri, S. Hardjomuljadi, dan S. Sami’an, “Legal Implications of Extension of Time in Power Plant Construction Projects: A Comparative Study of FIDIC and Indonesian Law”, sjss, vol. 6, no. 2, hlm. 220–237, Des 2025, doi: 10.37276/sjss.v6i2.565.