Wisatrioda, Bayu, et al. “Resolving Hydropower Plant Construction Disputes through a Standing Dispute Board: A Case Study of Asahan 3 HEPP”. SIGn Jurnal Hukum, vol. 6, no. 2, Jan. 2025, pp. 296-12, https://doi.org/10.37276/sjh.v6i2.392.