[1]
H. Wisnuaji, S. Sami’an, and S. Hardjomuljadi, “Interpretation of Schedule When Changes in Conditions: A Case Study of Price Adjustment in the Lampung Extra High Voltage Overhead Line Construction Contract”, sjh, vol. 6, no. 2, pp. 368–385, Feb. 2025, doi: 10.37276/sjh.v6i2.400.