[1]
B. Wisatrioda, R. R. Sebastian, S. Sami’an, and S. Hardjomuljadi, “Resolving Hydropower Plant Construction Disputes through a Standing Dispute Board: A Case Study of Asahan 3 HEPP”, sjh, vol. 6, no. 2, pp. 296–312, Jan. 2025, doi: 10.37276/sjh.v6i2.392.