1.
Wisnuaji H, Sami’an S, Hardjomuljadi S. Interpretation of Schedule When Changes in Conditions: A Case Study of Price Adjustment in the Lampung Extra High Voltage Overhead Line Construction Contract. sjh. 2025;6(2):368-385. doi:10.37276/sjh.v6i2.400