(1)
Wisnuaji, H.; Sami’an, S.; Hardjomuljadi, S. Interpretation of Schedule When Changes in Conditions: A Case Study of Price Adjustment in the Lampung Extra High Voltage Overhead Line Construction Contract. sjh 2025, 6 (2), 368-385. https://doi.org/10.37276/sjh.v6i2.400.