[1]
Wisnuaji, H., Samiā€™an, S. and Hardjomuljadi, S. 2025. Interpretation of Schedule When Changes in Conditions: A Case Study of Price Adjustment in the Lampung Extra High Voltage Overhead Line Construction Contract. SIGn Jurnal Hukum. 6, 2 (Feb. 2025), 368-385. DOI:https://doi.org/10.37276/sjh.v6i2.400.