Dispute Resolution Mechanism Related to Force Majeure Clauses in Construction Contracts: A Case Study of Procurement Process at the State-Owned Enterprises

  • Helmy Yulian Triwijaya Universitas Pekalongan, Indonesia
  • S. Sami’an Universitas Pekalongan, Indonesia
  • Sarwono Hardjomuljadi Universitas Pekalongan, Indonesia

Abstract

The COVID-19 pandemic caused significant disruptions in the execution of construction contracts, leading to disputes related to force majeure claims. This article examines the force majeure dispute resolution mechanism in construction contracts at XYZ Ltd, an Indonesian SOE. This research employs normative and empirical legal approaches, with a case study on XYZ Ltd. Primary data were obtained through analysis of construction contract documents, a legal opinion from the State’s Attorney, and other relevant documents. Secondary data includes statutory regulations, court decisions, and related legal literature. The data were analyzed using qualitative content analysis and case analysis techniques. The research findings reveal that XYZ Ltd resolved disputes with service providers through negotiation, taking into account the legal opinion from the State’s Attorney, which recognized the pandemic as force majeure but emphasized the principles of pacta sunt servanda and good faith. The involvement of the BPKP through a claim audit strengthened accountability and good corporate governance. The audit results served as the basis for negotiations to minimize state financial losses. This research highlights the complexity of applying force majeure clauses in construction contracts, the importance of renegotiation, and the crucial role of legal opinions and independent audits in dispute resolution at SOEs.

Keywords: Construction Contract, Covid-19, Force Majeure, Negotiation, SOEs

Article Metrics

Downloads

Download data is not yet available.

References

Alfian, M. F. D., Wijaya, A. U., & Kusnadi, S. A. (2023). Peranan Jaksa Pengacara Negara sebagai Caounterpart BUMN (Badan Usaha Milik Negara) di Bidang Non Litigasi. Jurnal Ilmu Hukum Wijaya Putra, 1(2), 203-214. https://doi.org/10.38156/jihwp.v1i2.132

Colonial Regulations, Staatsblad Number 23 of 1847 on the Burgerlijk Wetboek voor Indonesie/the Civil Code. https://jdih.mahkamahagung.go.id/legal-product/kitab-undang-undang-hukum-perdata/detail

Frisyudha, A. B., Budiartha, I. N. P., & Styawati, N. K. A. (2021). Renegosiasi sebagai Upaya Penyelesaian Wanprestasi dalam Kontrak Bisnis Selama Masa Pandemi Covid-19. Jurnal Konstruksi Hukum, 2(2), 344-349. https://doi.org/10.22225/jkh.2.2.3253.344-349

Government Regulation in Lieu of Law of the Republic of Indonesia Number 2 of 2022 on Job Creation (State Gazette of the Republic of Indonesia of 2022 Number 238, Supplement to the State Gazette of the Republic of Indonesia Number 6841). https://peraturan.go.id/id/perppu-no-2-tahun-2022

Harita, W. V., & Mudiparwanto, W. A. (2023). Analisis PKWT dan Perlindungan Hukum pada PT. Telmark Integrasi Indonesia (Perspektif Undang-Undang Cipta Kerja). Jatijajar Law Review, 2(1), 33-50. https://doi.org/10.26753/jlr.v2i1.1014

Henong, S. B. (2022). Dampak Pandemi Covid-19 terhadap Penyelesaian Proyek Konstruksi: Tinjauan Literatur Sistematis. Journal of Sustainable Construction, 2(1), 23-29. https://doi.org/10.26593/josc.v2i1.6018

Indahwati, A. N., Sami’an, S., & Hardjomuljadi, S. (2025). Arbitration in Resolving Construction Cost Claim Disputes Due to Time Extensions: A Study of Contract Law in Indonesia. SIGn Jurnal Hukum, 6(2), 263-281. https://doi.org/10.37276/sjh.v6i2.388

Irwansyah. (2021). Penelitian Hukum: Pilihan Metode & Praktik Penulisan Artikel, Revision Edition. Mirra Buana Media.

Iskandar, H. (2021). Hardship dalam Kontrak Bisnis Pasca New Normal Covid-19. Jurnal Justiciabelen, 4(2), 44-49. https://doi.org/10.30587/justiciabelen.v4i2.3566

Jaya, I., Hasibuan, G. C. R., & Nasution, D. M. (2023). Manajemen Komunikasi Proyek Konstruksi di Masa Pandemi Covid-19. Teknik, 44(1), 112-122. https://doi.org/10.14710/teknik.v44i1.45512

Junaedi, J., Saputro, A., & Sami’an, S. (2025). Challenges in Electrical Infrastructure Permitting: A Case Study of Substation Development in South Sumatra. SIGn Jurnal Hukum, 6(2), 313-327. https://doi.org/10.37276/sjh.v6i2.393

Law of the Republic of Indonesia Number 2 of 2017 on Construction Service (State Gazette of the Republic of Indonesia of 2017 Number 11, Supplement to the State Gazette of the Republic of Indonesia Number 6018). https://jdih.dpr.go.id/setjen/detail-dokumen/tipe/uu/id/1687

Law of the Republic of Indonesia Number 6 of 2023 on Enactment of Government Regulation in Lieu of Law Number 2 of 2022 on Job Creation Into Law (State Gazette of the Republic of Indonesia of 2023 Number 41, Supplement to the State Gazette of the Republic of Indonesia Number 6856). https://jdih.dpr.go.id/setjen/detail-dokumen/tipe/uu/id/1825

Marpaung, S., Nababan, R., & Silaen, A. P. (2024). Tinjauan Yuridis Pembatalan Perjanjian pada Masa Pandemi Covid-19 Ditinjau dari Kitab Undang-Undang Hukum Perdata. Jurnal Visi Pengabdian Kepada Masyarakat, 5(2), 99-114. https://doi.org/10.51622/njlo.v5i2.1036

Nababan, R., & Ntuacademy, M. (2022). Kontrak Perdagangan melalui Internet (Electronic Commerce) Ditinjau dari Hukum Perjanjian. Jurnal Visi Pengabdian Kepada Masyarakat, 3(2), 156-168. https://doi.org/10.51622/njlo.v3i2.2375

Nugroho, R., Hardjomuljadi, S., & Amin, M. (2022). Dampak Pendemi Covid-19 atas Timbulnya Klaim Waktu dan Biaya pada Proyek-Proyek Pembangkit Listrik di Indonesia. Jurnal Konstruksia, 14(1), 18-32. https://doi.org/10.24853/jk.14.1.18-32

Qamar, N., & Rezah, F. S. (2020). Metode Penelitian Hukum: Doktrinal dan Non-Doktrinal. CV. Social Politic Genius (SIGn).

Rostiyanti, S. F., & Agustin, A. (2023). Identifikasi Faktor Penyebab Keterlambatan Proyek Selama Pandemi Covid-19. Architecture Innovation, 7(1), 61-73. https://doi.org/10.22225/jkh.2.2.3253.344-349

Sampara, S., & Husen, L. O. (2016). Metode Penelitian Hukum. Kretakupa Print.

Sebastian, R. R., Wisatrioda, B., Sami’an, S., & Hardjomuljadi, S. (2025). Resolving Construction Disputes through Negotiation: A Case Study of Amendments to the Environmental Impact Assessment for an Electricity Infrastructure Project. SIGn Jurnal Hukum, 6(2), 282-295. https://doi.org/10.37276/sjh.v6i2.389

Setyowati, P. J. (2021). Akibat Hukum Pandemi Covid-19 sebagai Bencana Non Alam Medis dalam Menetapkan Force Majeure di Indonesia. Kosmik Hukum, 21(1), 1-9. https://doi.org/10.30595/kosmikhukum.v21i1.9407

Sijabat, W., Siregar, S., & Siregar, B. (2024). Dampak Pandemi COVID-19 Terhadap Pelaksanaan Proyek EPC PLTM Parmonangan II – 2x5 MW Tapanuli Utara. Jurnal Insinyur Profesional, 3(2), 178-184. https://doi.org/10.24114/jip.v3i2.37703

Sumantri, M. F. A., Sami’an, S., & Hardjomuljadi, S. (2025). Concurrent Delay and Price Adjustment in Multi-Year Contracts: An Indonesian Construction Law Perspective. SIGn Jurnal Hukum, 6(2), 343-367. https://doi.org/10.37276/sjh.v6i2.399

Vasarienė, D., & Jakulevičienė, L. (2021). Freedom to Conduct Business During the Covid-19 Pandemic. Tilburg Law Review, 26(1), 16-29. https://doi.org/10.5334/tilr.246

Wiraantaka, J. A., Sami’an, S., & Hardjomuljadi, S. (2025). Implementation of Legal Principles in Construction Service Agreements: A Normative Study. SIGn Jurnal Hukum, 6(2), 386-400. https://doi.org/10.37276/sjh.v6i2.401

Wisatrioda, B., Sebastian, R. R., Sami’an, S., & Hardjomuljadi, S. (2025). Resolving Hydropower Plant Construction Disputes through a Standing Dispute Board: A Case Study of Asahan 3 HEPP. SIGn Jurnal Hukum, 6(2), 296-312. https://doi.org/10.37276/sjh.v6i2.392

Wisnuaji, H., Sami’an, S., & Hardjomuljadi, S. (2025). Interpretation of Schedule When Changes in Conditions: A Case Study of Price Adjustment in the Lampung Extra High Voltage Overhead Line Construction Contract. SIGn Jurnal Hukum, 6(2), 368-385. https://doi.org/10.37276/sjh.v6i2.400

Yanuar, R., Saputro, A., & Sami’an, S. (2025). Sustainability of Infrastructure Development in Indonesia: A Legal Analysis of Price Adjustments in Construction Contracts. SIGn Jurnal Hukum, 6(2), 247-262. https://doi.org/10.37276/sjh.v6i2.385

Published
2025-02-16
How to Cite
Triwijaya, H. Y., Sami’an, S., & Hardjomuljadi, S. (2025). Dispute Resolution Mechanism Related to Force Majeure Clauses in Construction Contracts: A Case Study of Procurement Process at the State-Owned Enterprises. SIGn Jurnal Hukum, 6(2), 401-417. https://doi.org/10.37276/sjh.v6i2.402